SR525 Mukilteo Ferry Terminal Ferry Terminal Construction (Phase 2), Mukilteo WA
Walsh Construction Company II, LLC, as a prime contractor, is requesting bids from subcontractors and suppliers, including certified DBE firms, for the following:
SR525 Mukilteo Ferry Terminal Ferry Terminal Construction (Phase 2)
WSDOT
Bid Date: 11:00 a.m. PST, July 18, 2018
Subcontractor and supplier bids requested 24 hours prior to bid date
Project Introduction
This project includes for the improvement of SR525, Mukilteo Ferry Terminal, MP 8.47 vicinity, a Federal Aid (FTA-funded) project, by construction of ferry terminal including buildings, toll booths, fishing pier, overhead loading, berthing structures, steel piling, concrete work, retaining walls, paving, utilities, landscaping, and demolition of existing ferry terminal facility and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Work Scopes
Washington State Ferries (WSF) is relocating the Mukilteo ferry terminal to the tank farm site, one-third of a mile east of the existing terminal.
The project Summary:
• Provides new passenger, maintenance, and supervisor buildings, and four new toll booths.
• Installation of new ferry terminal building.
• Installation of vehicle transport bridge.
• Installation of overhead passenger loading.
• Includes a new signalized intersection and expanded vehicle holding area to reduce congestion on SR 525.
• Improves connections to transit with a new transit center and location near the Sounder Commuter Rail Station.
Major subcontracting opportunities include:
Sawcutting Landscaping QA/QC Program
Sidewalk Curb/Gutter/Ramps Driveways
Storm Drainage and Sewer Water Lines Excavation
System Ductbank Installation Survey Concrete Paving
Flatwork Concrete Asphalt Paving Maintenance of Traffic
Temporary Erosion Control Terminal Demolition Terminal Structural Steel
Terminal Doors and Hardware Terminal Drywall Terminal Painting
Terminal Ceiling Terminal Ceramic Tile Terminal Relites
Terminal Glass/Glazing Terminal Fire Suppression Terminal Electrical
Terminal HVAC System Terminal Plumbing System Pavement Markings
Marine Pile Driving Light Pole Foundations Traffic Signals
Station Concrete Station Electrical Station Lighting
Fiber/Communications Marine Structural Steel Concrete Pumping
Contaminated Material Removal Marine Demolition
DBE/SBE Goals and Requirements
The project has an Apprenticeship goal of 15% and DBE goal of 6%. Walsh intends to negotiate with all certified SBE and DBE firms to encourage project participation, including consideration of quotes for any item of work, portion of an item, or combination thereof.
Bonding and Insurance
Performance and payment bonds with a surety company, subject to the approval of Walsh, are required of subcontractors with subcontracts for $250,000 or more. We will reimburse bond premiums up to 2%. For questions/assistance regarding bonding, insurance, credit, equipment, supplies, materials or related services, please call our office at 206.392.7300. Your bonding rate must accompany your bid.
Plans and Specifications
Plans can be viewed on the WSDOT website at: ftp://ftp.wsdot.wa.gov/contracts/9244-MukilteoFerryTerminal(Phase2)FerryTerminalConstruction/
or at our Seattle office located at: 16400 Southcenter Parkway, Suite 501, Seattle, WA 98188
To schedule an appointment to view plans, please call (206) 394-7300.
Submitting a Bid
Please fax your bid to (206) 394-7398 or email Mark Michalak / mmichalak@walshgroup.com.
Not Bidding?
If you are choosing not to submit a bid for work, we would greatly appreciate you letting us know by emailing us at bid.wpcivil@walshgroup.com. If we do not hear from you within 10 days, we will follow up by phone, mail or email to see if additional information or assistance is needed.
We look forward to hearing from you.