You are here

Home » Stewart Road Bridge Replacement - CIty of Sumner

Stewart Road Bridge Replacement - CIty of Sumner

Johansen Construction Company (JCC) is requesting quotes from Subcontractors and Suppliers for the following project:

Project Name: Stewart Road Bridge Replacement

Owner: City of Sumner

Bid Closing Date: October 15, 2024 10:00AM

Subcontractor/Supplier Quote Due Date: October 14, 2024

DBE Condition of Award Goal: 21%

Project Duration: 899 Working Days

Special Schedule Consideration: This project will be a 4-year project. In water work must be completed between July 15, and September 15 of each year. Please see the staging plans located on Plan Sheets 6-13 (CS1-CS8).

***PLEASE BE ADVISED – IF YOU INTEND ON BIDDING THIS PROJECT, PLEASE FILL OUT THE WSDOT FORM 272-022 AND SUBMIT IT WITH YOUR BID; IF YOU ARE A DBE, PLEASE FILL OUT WSDOT FORM 422-031 AND SUBMIT IT WITH YOUR BID***

Bids to be submitted to: estimating@johansencci.com or via fax at (360) 829-5473

Point of Contact: Questions you have for JCC can be emailed to: estimating@johansencci.com, or you may call our office at 360-829-6493 and ask for Andy Smith in our Estimating Department.

Project Description: The project consists of the bridge crossing the White River within the Stewart Road SE, Butte Avenue SE, 140th Avenue Court E, and 140th Avenue E right-of-way and easements in the cities of Sumner and Pacific, and Pierce County. This work includes the demolition of the existing bridge structure; demolition of existing building structures; construction of a new, widened bridge structure with shared use path; removal and reconstruction of the east side levee; storm drainage piping, structures, and vaults; new water mains, service lines, and appurtenances; illumination; a utility trench consisting of new conduits, and vaults for spare conduits; and the installation of utility hangers between the girders of the new bridge.  The work includes but is not limited to; clearing and grubbing, removal of unsuitable materials, structural excavation, roadway excavation, dewatering, utility relocation, levee relocation, grading, storm drainage installation, water line installation, retaining walls, paving, curb and gutter, street lighting, signalization, channelization, signing and surfacing.

Subcontractor/Supplier Opportunities Include (but are not limited to): Aggregate supply and disposal, sheet pile supply and installation, erosion control, clearing & grubbing, pigmented sealer, concrete flatwork, prestressed concrete girder supply and haul, existing bridge and building demolition, rebar supply & installation, electrical & illumination, dewatering, fencing, guardrail, HMA paving, landscape, HMA planing, constructing 10’ diameter shafts, permanent signage, striping, survey, retaining walls, surcharge monitoring settlement plates. As well as the supply of ready-mix concrete, pipe/utilities/precast structures, and geotextile materials.

JCC encourages bids from all subcontractors and suppliers including Disadvantaged Business Enterprises (DBE’s), for any item of work, or portion of an item, or combination thereof related to this project. 

Bid Documents can be viewed at:

https://mrscrosters.bonfirehub.com/opportunities/153766

Link to WSDOT Form 272-022:

https://wsdot.wa.gov/publications/fulltext/forms/272-022.pdf

Link to WSDOT Form 422-031:

https://wsdot.wa.gov/publications/fulltext/forms/422-031.PDF

Closing Date: 
Tuesday, October 15, 2024
Organization: 
Johansen Construction Company
Point of Contact: 
estimating@johansencci.com