You are here

Home » Sub/Supplier Quote Request: 124th Avenue NE/Ichigo Way (NE 18th St.) to Northup Way

Sub/Supplier Quote Request: 124th Avenue NE/Ichigo Way (NE 18th St.) to Northup Way

Johansen Construction Company (JCC) is requesting quotes from Subcontractors and Suppliers for the following project:

Project Name: 124th Avenue NE/Ichigo Way (NE 18th St.) to Northup Way                      

Owner: City of Bellevue

Bid Closing Date: September 29, 2022, 10:00 AM

Subcontractor/Supplier Quote Due Date: September 28, 2022

DBE Condition of Award Goal: 20%

Project Duration: 345 Working Days

Bids to be submitted to: estimating@johansencci.com or via fax at (360) 829-5473

Point of Contact: Questions you have for JCC can be emailed to: estimating@johansencci.com, or you may call our office at 360-829-6493 and ask for Andy Smith in our Estimating Department.

Project Description: This Contract will widen 124th Ave. NE to a four-lane arterial with a two-way left turn, landscape strips and sidewalks, extending improvements from the NE Spring Boulevard to NE Ichigo Way segment, which was constructed in 2020. Improvements will include a fish-passable culvert for West Tributary to Kelsey Creek, underground utilities, street lighting, new traffic signals and existing traffic signal modifications, landscaping, urban design treatments, and revised access for sites along the roadway, compatible with current and future land use. Work contemplated to be performed under this contract is as follows: removal of structures and obstructions, cement concrete curb and gutter, cement concrete sidewalk, asphalt concrete pavement, asphalt for multi-use trail, cement concrete pavement, water main improvements, sanitary sewer improvements, fire department connections, storm drainage improvements, soldier pile retaining walls, cast-in-pace retaining walls, structural earth retaining walls, gravity block walls, fish passable 3-sided box culvert, dewatering, stream grading, bypass, and fish handling, illumination systems, traffic signals systems and temporary traffic signal systems, intelligent transportation systems, landscaping, irrigation, and urban aesthetic features, fencing, pedestrian railings, and gates, joint utility trench, property restoration and miscellaneous work, all in accordance with the Contract Plans, Contract Provisions, and the Standard Specifications.

Subcontractor/Supplier Opportunities Include (but are not limited to): clearing & grubbing, erosion control, soldier pile retaining walls, structural earth retaining walls, gravity block walls, HMA paving, concrete paving, planing, striping, landscaping, hauling, permanent signage, hydro seeding, traffic barriers, dewatering, electrical, traffic control, survey, flatwork concrete, structural concrete, furnish & install rebar, shotcrete facing, fencing, pedestrian railings, and gates. As well as the supply of ready-mix concrete, pipe/utilities, aggregate, wall materials, and disposal.

JCC encourages bids from all subcontractors and suppliers including Disadvantaged Business Enterprises (DBE’s), for any item of work, or portion of an item, or combination thereof related to this project. 

Bid Documents can be viewed at:

http://bxwa.com/bxwa_toc/pub/255/blv58_124th_ave_ne_ichigo_way_34619/info.php

Closing Date: 
Thursday, September 29, 2022
Organization: 
Johansen Construction Company
Point of Contact: 
estimating@johansencci.com