Surprise Lake Middle School Project, Milton WA

PROJECT: Surprise Lake Middle School Project

LOCATION: 2001 Milton Way; Milton, WA 98354

 

OWNER: Fife School District NO. 417; 5802 20th Street East; Fife, WA 98424; Contact: Kateri Schlessman; Phone: 206-459-5820; Email: kateri.schlessman@esd112.org

 

GCCM: Cornerstone General Contractors, Inc.; 11805 North Creek Parkway South, Ste #115; Bothell, WA 98011; Contact: Sam Comer; Phone: (425) 481-7460, Email: sam@cornerstonegci.com

 

ARCHITECT: Integrus Architecture; 117 South Main Street, Suite 100; Seattle, WA 98104; Contact: Loretta Sachs; Phone: 206-628-3138; Email: lsachs@integrusarch.com

For the following bid packages, sealed bids must be received at Fife School District No. 417 Capital Projects Office located at 5802 20th Street East, Fife, WA 98424 at time and dates listed below.

BIDS DUE: May 31, 2019 at 2:00 PM.

 

BID PACKAGE; APPROX. BUDGET; DESCRIPTION

BP-03.1; $6,000,000; Structures

 

IT IS THE INTENT OF CORNERSTONE GENERAL CONTRACTORS, INC. TO BID ON BID PACKAGES BP-03.1 AS A TRADE CONTRACTOR. FOR THIS REASON, THE OWNER WILL EXCLUSIVELY MANAGE THE BIDDING PROCESS FOR THESE BID PACKAGES.

 

BID DOCUMENTS: Bid Contractors may obtain one set of plans and specifications from ARC Reprographics upon receipt of a refundable deposit of $200.00 made payable to Cornerstone General Contractors, Inc.

ARC Document Solutions

2730 Occidental Ave S

Seattle, WA 98134

Phone: (206) 622-6000

Plans and specifications may also be viewed at Builders Exchange at www.bxwa.com under Cornerstone General Contractor’s Inc, link, Projects Bidding (no password required).

BONDS: For all bids that exceed $300,000 a Performance and Payment Bond is required. Bid Bond in the amount of 5% of the total bid is required for ALL bids that exceed $300,000.

PREBID MEETING: BP’s Bidding Between 5/30/19 – 5/31/19

Date/Time: May 15, 2019 @ 3:00 PM; Location: Surprise Lake Middle School; 2001 Milton Way, Milton, WA 98354; Prebid Meeting attendance is mandatory for all prospective bidders of all bid packages with the exception of BP-21.1 Fire Protection.

 

SCOPE: See Section 002410 – General Scope of Work and Section 002413 – Specific Scope of Work.

NOTES: Cornerstone General Contractors Inc. is acting as a construction manager for the Fife School District, not as a general contractor on this project. For this reason, all rules for public bidding must be followed by all contractors bidding these packages. Bids must be submitted as indicated in the Instructions to Bidders. Faxed bids, bids which are not on the proper bid form, and bids that do not fulfill the requirements of the Instructions to Bidders, cannot be accepted. All bids shall remain valid for a period of 90 calendar days. Refer to RCW 39.10.380, Cornerstone General Contractors has a labor agreement with the Pacific Northwest Regional Council of Carpenters.; Cornerstone is an equal opportunity employer and request bids from all interested firms including disadvantaged, minority, women, disabled veterans and emerging small business enterprises.

 

Closing Date: 
Friday, May 31, 2019