Terminal 91 Programmatic Design
Category: Consulting Services
Proposal Due Date: December 15, 2025, 12:00PM
Pre-Proposal Conference: November 20, 2025, 11:00AM, Online
Amount: Not to Exceed (NTE) $6M
Goal: WMBE Goal 15%
Design and construction support services of the T91 Dock Rehabilitation. This will include special purpose inspections (if necessary) to pier structures, repair design inspections to pier structures, and a 100% design to rehabilitate pile caps, deck panels, and other related infrastructure to preserve existing use of the pier and extend the service life of the rehabilitated components of the pier at T91. More Information

