You are here

Home » TPU Administrative Building North Entry & Atrium Replacement

TPU Administrative Building North Entry & Atrium Replacement

Project Name

TPU Administrative Building North Entry & Atrium Replacement

Location:

3628 South 35th Street, Tacoma, WA 98409

Owner/Agency:

City of Tacoma

Point of contact:

BCRA Architects

Architect:

Aaron B.

Estimate:

$1,300,000

Bids:

July 29th, no later than 11 am (please send your proposal before 10:00am if able due to the size of the project, need time to call if we need clarification).

Project Description:

1. Demolition of the existing storefront and automatic sliding doors, granite sill, and removal of portions of the terrazzo and top of slab for the new walk-off mat.

2. Installation of a revolving door, replacement of an interior walk-off mat, installation of storefront doors, installation of storefront frame, and reinstallation storage room door to reverse swing.

3. Refinishing exterior terrazzo at entry and steps.

4. Removal and replacement of the existing atrium glass curtain wall

5. Installation of an air-curtain above storefront doors, and radiant heaters with air thermostat at the front entry way. Tacoma Public Utility will provide all labor and materials for this work in coordination with the Contractor.

6. Installation of electrical utilities for power to the air-curtain, radiant heaters, and revolving door. Tacoma Public Utilities will provide all labor and materials for this work in coordination with the Contractor with the exception of labor and materials for the revolving door. For the revolving door, Tacoma Public Utilities will provide all labor and materials from the electrical panel to the disconnect as shown on the drawings. It is the Contractors responsibility to provide all labor and materials downstream of the disconnect for the revolving door.

This project does have a OMWBE goal:

No percentage provided; it is an Equity in Contracting Program

Additional Information:

  • Prevailing wage rates and Mandatory 15% apprentice requirements apply to this project.
  • Lincoln Construction encourages bids from ALL subcontractors and suppliers including SBE, NBE, MBE, DBE, VBE, DVBE, and WBE businesses.

Documents:  

Complete plans, specs & addenda for this project are available on-line at quest CDN.

​If you are unable to download the documents from the website above, please reach out (bids@lincolnnw.com) and we can send you a link.

Email to:

PLEASE EMAIL TO OUR DEDICATED BIDS EMAIL: bids@lincolnnw.com (253) 847-6414

Closing Date: 
Tuesday, July 29, 2025
Organization: 
Lincoln Construction
Point of Contact: 
bids@lincolnnw.com