You are here

Home » TriMet Columbia Bus Base Materials Management Center Remodel

TriMet Columbia Bus Base Materials Management Center Remodel

Project: TriMet Columbia Bus Base Materials Management Center Remodel

Bid Date: 06.30.21

Estimated Cost: $4.5

Location: 4421 NE Columbia Blvd. Portland OR 97218

Construction Summary:


The Contractor shall provide interior structural, finish work and outside aesthetics (tenant improvements) to renovate TriMet’s Materials Management Center at its new Columbia Bus Base. Ground floor area, 30,973 SF and loading dock, 2,620 SF. The major elements of the work for this package consist of: 1. Demolition of interior construction in areas noted. 2. Demolition of exterior construction in areas noted. 3. Install walls, ceilings, doors, and other items in the areas noted. 4. Fire protection, plumbing, mechanical, electrical, and low voltage installation and modifications as noted. 5. Install finishes and signage as noted. 6. Install trash enclosure and secondary storage container as noted. 7. Landscaping and irrigation as noted. 8. Coordinate with TriMet and other contractors on OFCI and OFOI items. The following items are to be salvaged and re-used in the project: 1. Chain Link Fence and Gate. 2. Fire Extinguishers. 3. Hazardous Materials Storage Container. 4. Storage Pallets (by others). 5. Radiant Heaters.

Plans and specifications are available for download. Access to documents is also available in electronic format at no cost, from Skyward Construction.

http://skywardconstruction.com/bidding

 

Skyward Construction, Inc.

15908 NE 10th Ave

Ridgefield, WA 98642

Phone: 360-546-1625

POC: Erica Cheek, Project Coordinator bids@skywardconstruction.com

 

 

 

Closing Date: 
Wednesday, June 30, 2021