You are here

Home » UW Parrington Hall Renovation, Seattle WA

UW Parrington Hall Renovation, Seattle WA

 

INVITATION TO BID

 

Title:
Parrington Hall Renovation - 100% CD - Project Award Pricing

 

Bid Due Date: Vary By Code

 

     

 

     

 

Contact:
Andrew Havranek

Phone:
(253) 446-3417

 

     

Project Description:

     

This round of pricing is based on the 100% CD documents. We would like to receive quotes based on the due dates assigned to each scope. We will be following-up with written scopes of work as they become available. Our priority is finalizing pricing for Divisions 6,7,8, and 9 by the end of July.

For project and scope-specific questions please contact:


Jake Peavler | Project Manager | T 253.446.3329 | M 206.484.9245
jake.peavler@absherco.com



- Project Summary -

The project consists of a complete interior renovation of the existing Parrington Hall. The intent is to completely reconfigure the existing floor plans to maximize classroom space and faculty offices on Levels 1-3, and also "refresh" and update student lounge spaces at the Basement Level and 4th Floor level. The building is approximately 40,000sf and will consist of select and structural demo, added footings, structural steel framing and new stairs, miscellaneous wood framing, thermal and acoustical insulation, new doors, interior glazing, all new finishes including new drywall, flooring, ceiling finishes, wall finishes, wood paneling, painting, tackable wall coverings, visual display boards, cafe/kitchen equipment, and a retrofit/renovation of MEPF systems.

     

 

Currently bidding Divisions 6-8, GWB and bids are due no later than 7/31/2019. Divisions 9-32 out to bid around 8/1, with an estimated bid date of 8/31.

Closing Date: 
Wednesday, July 31, 2019