WFLHD Ridgefield Wildlife River S Unit Bridge Replacement, Ridgefield WA
WFLHD Ridgefield Wildlife River S Unit Bridge Replacement
Your proposals are due no later than September 27, 2018 02:00 PM .
This project consists of bridge construction over a navigable water way and BNSF mainline railroad tracks, MSE retaining walls, approach embankments, soft ground improvements, culverts, utility line relocations, bridge demolition, and surfacing gravels. and other small items of work.
Div 100 - Div 150 - Jake Oullette (Jake@stellarj.com)
Div 200 - Div 250 - Ed Hagedorn (Ed@stellarj.com)
Div 550 - Div 700 - Jake Oullette (Jake@stellarj.com)
Please note that we prefer to receive quotes directly and we do not require you to be a member of SmartBid.
All plans, specs and addenda are also available at: www.stellarj.com/bidding.
You can respond by clicking on one of the links above to let us know your intentions.
Thank you!
Estimating Department
(360) 225-7996
Bids@stellarj.com

