Project Description: A prior construction contract prepared the site for the work of this contract through existing building demolition, mass excavation, some utility installation, some erosion control, and construction of a gravel building pad. The work of this contract will include earthwork, utilities, landscape, other on-site & off-site work, and construction of a new steel frame, 2-story school bldg of approx 75,000 sf.
Estimated Value: $28 million
Contract Duration:
NTP approx 12/6/18
• On-site commencement of construction: 1/2/19
• Bldg substantial completion: 7/6/20
• Completion of punch list: 30 days after substantial completion
• Final completion: 45 days after substantial completion
Wage Rates: This project is subject to WA State L&I prevailing wage rates. Certified payroll will be required.
Pricing Requirements:
• Base Bid
• Alternate 1: Add childcare wing
• Alternate 2: Add covered play structure
• Alternate 3A: Add Siemens EMS control system
• Alternate 3B: Add Johnson Controls EMS Control System
• Alternate 4: Add dual core heat exchanger
• Alternate 5: Add classroom AV and voice enhancement system equipment
Pease & Sons, Inc. is an Equal Opportunity Employer and we actively encourage and promote a diverse workplace. Our firm is seeking bids from all qualified and capable firms, large and small businesses including, but not limited to, Emerging Small, Women, Minority, Disadvantaged, Native, Veteran, Vietnam Veteran, Disabled Veteran, 8(a), and HUBZone businesses.
Pease & Sons, Inc. is signatory to the Carpenters and Laborers Unions.
Documents:
Complete plans, specs & addenda for this project are available on-line as follows:
OPTION 1 (via Builder’s Exchange):
1. http://www.bxwa.com 5. Click on Projects Bidding
2. Click on Posted Projects 6. Review Terms & Conditions
3. Click on Public Works 7. Click on bid date for project
4. Click on Seattle Public Schools 8. Click on documents accordingly
OPTION 2 (via Building Connected):
1. https://app.buildingconnected.com/public/54851299f6acaf07002fd502
2. Click on Wing Luke Elementary School Phase 2 Construction.
3. Scroll down, find the correct bid package and click on Join RFP.
4. You will be prompted for an email address and password. If you are not already registered for Building Connected, you may do so at this time.
P.O. BOX 44100, TACOMA, WA 98448
253.531.7700 FAX 253.537.8113
We are an equal opportunity employer and request bids from all interested firms including disadvantaged, minority, and women business enterprises.
PLEASE FEEL FREE TO EMAIL THE PROJECT ESTIMATOR
Bids@Peaseandsons.com
PEASES*302PO