You are here

Home » Benthian Loop Utilities and Lakes Apartments and Fife Business Park Water Service Replacement, Fife WA

Benthian Loop Utilities and Lakes Apartments and Fife Business Park Water Service Replacement, Fife WA

 

Project documents may be found at the following link:

https://skillings-my.sharepoint.com/:f:/p/dhall/EoLmSwxDtFREpy1iY6swW5QBSxdjCzss71prmGA5YZLmhw?e=a7qubV

Addendum No 1 Documents may be found at the following link:

https://skillings-my.sharepoint.com/:f:/p/dhall/Ev_AANkzB5RKmi-9YGMe1swBxue1mikzv2whVSYzlTP-aQ?e=qewSO2

Addendum No 2 Documents may be found at the following link:

https://skillings-my.sharepoint.com/:f:/p/dhall/EkpBeFhzrzdKkz7x-6JiS5MBQGdKAkAJEYwk1MZ0OZIkAA?e=EN3fcQ

Addendum No 3 Documents may be found at the following link:

https://skillings-my.sharepoint.com/:f:/p/dhall/Eu-oQOyg4htOt0kftBBep8YBNClGwJ3WpJwDTHb7B1OhdQ?e=9tAAGI

Addendum No 4 Documents may be found at the following link:

https://skillings-my.sharepoint.com/:f:/p/dhall/EhGSpZzcdyFOrhs4s6hfTNIBj6syZfnMz9xIhz4tIo0drA?e=ZW1wv0

Bid Date: 11/16/2018 @ 10:00am.

Project Name: Benthian Loop Utilities and Lakes Apartments and Fife Business Park Water Service Replacement, City of Fife, WA

Owner:

City of Fife
City Hall
5411 23rd Street East
Fife, WA 98424
253-922-9315

Non-Mandatory Prebid: 11/1 at City Hall.

Description:

Benthien Loop Utilities includes the construction of approximately 3,900 linear feet of 8 and 12-inch ductile iron water main, the installation of 9 fire hydrants, 26 water service connections, approximately 2,400 linear feet of 2-inch HDPE sanitary sewer forcemain, 21 sanitary sewer connections, the construction of approximately 500 linear feet of new roadway and the resurfacing of approximately 3,100 linear feet of existing roadway plus other miscellaneous work.

Lakes Apartments and Fife Business Park Water Service Replacement consists of replacement of seven (7) water services at Lakes Apartments, including new service line, setters, separating deduct meters and installing double check valve assemblies and associated restoration and six (6) sites at Fife Business Park including new service line, separating deduct meters, installing double check valve and reduced pressure backflow assemblies and associated restoration.

 

Closing Date: 
Friday, November 16, 2018