WASTEWATER TREATMENT FACILITY IMPROVEMENTS

 

Owner: CITY OF MORTON

 

Location: MORTON, WASHINGTON.

 

Bid Date: FEBRUARY 16TH, 2021 AT 11:00 AM

 

Schedule A - WWTF: Construct a new headworks, secondary clarifiers, UV disinfection system, outfall, and solids handling building. Work includes modifications and/or demolition of the existing headworks, oxidation ditch, secondary clarifiers, chlorine contract tank, operations building, and sludge drying beds.

Schedule B - Oxidation ditch cleaning: Provide temp removal of the oxidation ditch from service including disposal of biosolids, cleaning and structural repairs of oxidation ditch tank. While the oxidation ditch is out of service, the project includes furnishing and installing a temp wastewater treatment system to include a temp pump station, equalization tank, biological treatment system, piping, electrical and SCADA system.

 

The work shall be Substantially complete: 360 WORKING DAYS

 

Wages: PREVAILING WAGE

 

Seeking proposals from qualified and certified DBE contracting & supplier firms on the following: ELECTRICAL, PLUMBING, LANDSCAPING, CONCRETE, PAVING, FENCING, HYDROSEEDING, HVAC, and SURVEYING.

 

If you are interested in this project and would like plans and specs please contact the Estimating Department at estimator@rotschyinc.com or call 1.360.334.3100.

 

Rotschy Inc is an Equal Opportunity Employer.