Lower Russell Levee Setback Planting- Maintenance & Irrigation
Project Information: Lower Russell Levee Setback Planting- Maintenance & Irrigation
Work Site: In the City of Kent, along the right (eastern) bank of the Green River, between River Mile (RM) 19.25 and 17.85
Project Description: approx. 10 acres of temporary irrigation installation Winter 2022, Two-year site maintenance of approx. 23.5 acres, including weed and herbivory control and maintenance of temporary irrigation system. Work will occur in and adjacent to environmentally sensitive areas (river corridor, floodplain, and wetlands).
Submission of Bids: Terra Dynamics, Inc
PO Box 2479
Auburn, WA 98071
Fax: 253-880-3109
rebekah@terradynamics.com
Approximate Start Date: April 2022 (maintenance of phase 1) December 2022 (Phase 2 Irrigation), April 2023 (Phase 1 & 2 maintenance) to conclude April 2024.
Closing Date: April 29, 2022
Bid Documents:
Please contact Rebekah Washington at 253-880-3100 or rebekah@terradynamics.com for drawings and specs or if you should have any questions.