SR 503/SR502 Intersection Improvements Battle Ground, WA
This Contract provides for the improvement of the SR 503 (NW and SW 10th Avenue) and SR 502 (W Main Street) intersection for provision of right turn lanes and additional left turn lanes. The Project includes clearing and grubbing, roadway excavation, storm sewer conveyance, treatment and detention, HMA paving, erosion control, curb and gutter, refuge island construction, sidewalk, traffic control, pavement marking, signing, traffic signal system, illumination and other work, all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.
The work shall be substantially completed: 150 WORKING DAYS.
Wages are Prevailing Wages.
Seeking proposals from qualified and certified DBE Contracting & Supplier firms on the following: AC PAVING, CONCRETE, FLAGGING,DUMP TRUCKING, SAWCUTTING, SURVEYING, ELECTRICAL, ETC.
If you are interested in this project and would like plans and specs please contact the Estimating Department at estimator@rotschyinc.com or call 1.360.334.3100.
Rotschy Inc is an Equal Opportunity Employer.