I90 North Bend to Snoqualmie Pass Bridge Deck Rehab
Max J. Kuney is bidding as a Prime Bidder on the following WSDOT Project and we are requesting Subcontractor and Supplier pricing from all subcontractors and suppliers.
I90 North Bend Vic to Snoqualmie Pass Vic Deck Rehab and Drainage Repair
OWNER: Washington State Department of Transportation
LOCATION: North Bend to Snoqualmie Pass, Washington
DBE GOAL: 18%
ADVERTISED PROJECT RANGE: Under $15,000,000
BID DUE: June 28, 2023 @ 11 AM PST
SUBQUOTES DUE: Scope letters due by 5 pm June 26, 2023 and pricing by 5 pm June 27, 2023 to allow time to review and respond with questions if necessary.
DESCRIPTION OF WORK:
This Contract provides for the improvement of *** I-90 from MP 34.74 to MP 55.16 in King and Kittitas Counties with work consisting of rehabilitating five bridges and their bridge approach slabs by scarifying concrete surfaces, cement concrete pavement grinding, planing bituminous pavement, and applying modified concrete overlays. Bridges 90/91.5S, 90/95S, 90/96S, and 90/98.6N require expansion joint modifications, and Bridge 90/105S requires installation of a temporary median cross over, pavement seat modifications and a new bridge approach slab. Other work includes: improvement of approximately 60 drainage structures by modifying grate inlets, installing energy dissipator tees and downslope pipe restraint systems, replacing cement concrete panels, performing trench drain repair and erosion and scour protection; roadway surface improvements with hot mix asphalt pavement repair and hot mix asphalt paving; installing illumination system and delineation; temporary traffic control *** and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Scopes of work include but are not limited to the following:
Asphalt Pavement; Asphalt Rotomilling; Bridge Approach Slabs; Cement Concrete Pavement Grinding; Cement Concrete Panel Replacement; Concrete Deck Prep; Concrete Deck Repairs; Concrete Deck Texturing; Concrete Demolition Containment; Concrete Overlay Placing, Curing and/or Finishing; Concrete Pumping; Concrete Rotomilling; Concrete Slurry Collection, Treatment and/or Disposal; Concrete Supply; Construction Water Supply; Dump Trucking; Drainage Modifications; Expansion Joint & Pavement Seat Modifications; Hydrodemolition Scarification; Illumination System and Delineation; Joint Saw & Seal; Survey; Temporary Erosion Control; Temporary Traffic Control
Bid Documents:
- Copies of the Contract Documents are available online at the WSDOT link below.
https://ftp.wsdot.wa.gov/contracts/XE3447-NorthBendVictoSnoqualmiePassVicDeckRehab/
- J. Kuney is an Equal Opportunity Employer and we strive to work with potential UDMWVESB firms by evaluating the scopes of work on projects to determine what opportunities exist for UDMWVESB firms, and will work to break up bid packages into smaller pieces. Often bonding and resource capacity is a barrier to entry for smaller UDMWVESB’s, and creating smaller bid packages can allow a greater number of opportunities for disadvantaged firms. Feel free to email me at estimating@maxkuney.com if you would like to discuss options.