Invitation to Bid: Fire Station 31 Replacement

Owner: City of Seattle

Submittal Date: November 1, 2023

Project Address: 11302 Meridian Ave N, Seattle, WA 98133

This Project is a Covered Project subject to the City of Seattle’s Community Workforce Agreement (CWA)

 

PROJECT DESCRIPTION:  Construction of an all new 22,000 gsf, three-story fire station and associated site improvements. Project includes but not limited to: regrading, repaving, and construction of all new right of way

improvements on N 113th Street and a new fire apparatus driveway and associated emergency vehicle traffic signal on Meridian Ave N.

 

Alternate #1: Jack-up slab at Fitness Room

Base Bid: At Level 3 Fitness room, provide rigid foam insulation at depth required to provide flush transition between room finish floor and hallway finished floor, over primary concrete slab and metal deck structural floor. See A011/1-F4.  

Alternate (Substitutive) #1: At Level 3 Fitness room, provide jack-up slab floor assembly as specified in Section 03 47 16 - Cast-In-Place Floating Floors, over concrete slab and metal deck structural floor. See A011/1-F4.

 

Alternate #2: Four-fold Doors at Apparatus Bay

Base Bid: Provide sectional doors (SEC-1) as specified in Section 08 36 13 - Sectional Doors.

Alternate (Substitutive) #2: Provide four-fold doors as specified in Section 08 36 28 - Four-Panel Folding Doors (FFLD-1) in lieu of overhead coiling doors.

 

Alternate #3: Curtainwall at Meeting Rooms

Base Bid: Continue wall assemblies W4B and A6 with no openings at north wall of Meeting Room 102. 

Alternate (Substitutive) #3: Provide approximately 15' wide Curtainwall Assembly at north wall of Meeting Room 102, as specified in Section 08 40 00 - Aluminum Framed Glazing Systems and as indicated on Sheet A050/CW-101, in lieu of `continuous W4B and A6 wall assemblies.

 

Alternate #4: Carport

Base Bid: Provide striping and paving only for extra-wide Fire Department operational SUV.  

Alternate (Additive) #4: Provide carport as located in plan and detailed on sheet G100.

 

Alternate #5: Fire Protection Booster Pump

Base Bid: Provide complete fire protection system specified in section 21 05 00 – Common Work Results for Fire Suppression Systems with no booster pump.

Alternate (Additive) #5: Provide complete fire protection system as specified in section 21 05 00 – Common Work Results for Fire Suppression Systems with booster pump if required by designer of record.

 

Must comply with State of Washington prevailing wage requirements.

Estimated Cost: $24.38M

Duration: 490 Calendar Days

 

Proposal Due Date/Time: Wednesday, November 1st, 2023 / 2:00 PM

 

Submit bids to: estimating@formacc.com or fax to (360) 943-5868

 

FORMA Bid Schedule: https://formacc.com/wp-content/uploads/2023/10/FORMAbids_10.23.23.pdf

 