You are here

Home » Kitsap Transit Project KT 23-871 Seattle Terminal Site Environmental Study

Kitsap Transit Project KT 23-871 Seattle Terminal Site Environmental Study

NOTICE IS HEREBY GIVEN that emailed proposals will be received NO LATER THAN 2:00 P.M. December 1, 2023 and should be addressed as:

 

SEATTLE TERMINAL ENVIRONMENTAL STUDY RFQ KT #23-871

Kitsap Transit (KT) is soliciting proposals from qualified Consultants to conduct the required National Environmental Policy Act (NEPA) and State Environmental Policy (SEPA) reviews and facilitate community and stakeholder engagement to prepare Draft and Final Environmental Impact Statements and a SEPA Determination leading to selection of a preferred alternative and issuance of a Record of Decision. In addition to advancing the design of the project as necessary to perform the environmental review, design of the preferred alternative may be advanced through preliminary engineering concurrent with preparation of the EIS.

The environmental review will be conducted in accordance with the requirements of NEPA, SEPA and associated environmental regulations including the National Historic Preservation Act (NHPA) Section 106, the Endangered Species Act (ESA) and the Marine Mammals Protection Act (MMPA). The draft EIS is expected to study the locally preferred alternatives and a No-Build alternative. KT will serve as the lead agency for purposes of SEPA environmental review and FTA will serve as the lead agency for NEPA.

Plans, specifications and addenda for this project are available on-line through Kitsap Transit’s Website www.kitsaptransit,com or by emailing Patrick Rogers at patrickr@kitsaptransit.com

 

 

Closing Date: 
Friday, December 1, 2023
Organization: 
Kitsap Transit
Point of Contact: 
patrickr@kitsaptransit.com