Ohno Construction invites your firm to submit a bid for the following project:

Genesee Playfields 1&2 Replacement

City of Seattle

PROJECT DESCRIPTION:

Scope of Work: included as part of the Base Contract, but is not limited to, the following:

Installation of new synthetic turf field with review, site infrastructure, installation of new field fencing, field layout striping, new bleacher seating.

Will also include repair/replacement of existing asphalt pathways and concrete landing pads to meet accessibility standards. Each playfield will be initiated and completed separately in phases: Phase 1 will be Playfield #2 (Upper Playfield) and Phase 2 will be Playfield #1 (Lower playfield)

Location: 4316 Genesee Street, Seattle, WA 98118

Wages: PLA – please note PLA inclusion in bid

Working Days: 240

Special Cases: Please note there is an Apprentice Utilization Requirements for this bid.

WMBE Goals 5%

BID DUE DATE & TIME:  Tuesday July 9th, 2024 @ 2:00 PM

Proposals may be emailed to estimating@ohnoconstruction.com or faxed to 206-324-8063. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.

BID DOCUMENTS:

Bid documents are available here: https://ohno.sharefile.com/home/shared/fo6bb25c-d916-4fed-b20e-43658bae57e2

Enter Email:                                  ohnocc.wa@gmail.com

Enter Password:                           Yosh1966!

*Any subcontractors who are interested in submitting a quote for this project please be advised to review any proof of Covid Vaccination requirements for on-site workers before turning in a bid. All specifications (including those relating to Covid) apply to all subcontractors and suppliers.

Bid documents are provided for your reference only. Ohno makes its best attempt to provide subcontractors with the most complete and current project information for bidding purposes. However, Ohno is not responsible for the accuracy of the supplied bid documents. All takeoff quantities provided by Ohno are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote. Please contact the Estimating Department for any questions.

STANDARD REQUIREMENTS:

By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. Any and all bids may be rejected at the sole discretion of Ohno Construction. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2 percent. The surety must be a Washington admitted surety. Insurance must name Ohno, the project Owner and any other parties so designated as additionally insured and be in the types and amounts required by the specifications. Please contact our office if you need assistance.

Closing Date: 
Tuesday, July 9, 2024
Organization: 
Ohno Construction
Point of Contact: 
Maya Wimberger