Redmond Central Connector Phase III
- Construction of approximately 1.6 miles regional trail along the former Burlington Northern Railroad corridor from the 9900 Block of Willows Road NE to NE 124th Street.
- The trail will generally consist of a 12-foot wide paved (hot mixed asphalt pavement) trail with 2-foot gravel shoulder along the west side and 3-foot gravel shoulder along the east side.
- Grading and installation of storm drainage facilities.
- Install raised trail crossing and associated improvements at driveway crossings.
- Intersection improvements at 9900 Block, NE 100th Court, NE 102nd Street, NE 116th Street, and NE 124th Street (curb ramps, curb and gutter, pavement restoration, hardscape/landscape features, and pavement marking).
- Roadway reconstruction at NE 116th Street.
- New pedestrian traffic signal at 9900 Block and NE 100th Court.
- Pedestrian traffic signal modifications at NE 124th Street.
- Traffic signal modifications at NE 102nd Street and NE 116th Street.
- New illumination system along the trail from 9900 Block to NE 124th Street.
- Installation of landscape and urban design improvements.
- Wetland and stream mitigation.
- And other work necessary to complete the Project.
The Engineer’s Estimate for this work is $3,800,000 to $4,200,000.
Plans and specifications are posted on http://www.bxwa.com/.
Closing Date:
Thursday, July 25, 2024