Johansen Construction Company (JCC) is requesting quotes from Subcontractors and Suppliers for the following project:

Project Name: SR 161, Unnamed Trib. To South Creek – Remove Fish Barrier                 

Owner: Washington State Department of Transportation

Bid Closing Date: July 24, 2024 11:00 AM

Subcontractor/Supplier Quote Due Date: July 23, 2024

DBE Condition of Award Goal: 19%

Project Duration: 75 Working Days

Special Schedule Consideration: Per WSDOT Special Provision 1-08.5, work related to this project shall not begin earlier than Monday, June 23, 2025.

Bids to be submitted to: estimating@johansencci.com or via fax at (360) 829-5473

Point of Contact: Questions you have for JCC can be emailed to: estimating@johansencci.com, or you may call our office at 360-829-6493 and ask for Andy Smith in our Estimating Department.

Project Description: Replacing the existing 36-inch and 18-inch diameter concrete culverts with an 18-foot minimum hydraulic opening, contractor designed buried structure. The Work includes a temporary stream diversion system, erosion control, dewatering, clearing grubbing, tree removal, guardrail removal, structure and channel excavation, construction of a temporary traffic bypass, temporary illumination system, temporary shoring, temporary drainage, removing existing culverts, installation of one contractor designed buried structure, concrete topping, traffic barrier, bridge railing, backfilling, grading, crushed surfacing base course, planing and paving with HMA, drainage, pavement marking, signing, guardrail, guardrail anchor, guardrail terminals, stream bed restoration, seed, fertilizer, mulch, planting, traffic control, and other work. Involves 75 working days and 86 items. Work class 1 or 6.

Subcontractor/Supplier Opportunities Include (but are not limited to): clearing & grubbing, erosion control, supply and/or install of large woody debris, HMA paving, striping, survey, permanent signage, traffic barriers, bridge railing, illumination, guardrail, landscaping, fencing, material hauling, and rebar supply & installation. As well as the supply of ready-mix concrete, pipe/utilities/precast structures, aggregate supply, and material disposal.

JCC encourages bids from all subcontractors and suppliers including Disadvantaged Business Enterprises (DBE’s), for any item of work, or portion of an item, or combination thereof related to this project. 

Bid Documents can be viewed at:

https://ftp.wsdot.wa.gov/contracts/XE3555-UnnamedTribtoSouthCreekRemoveFishBarrier/

Closing Date: 
Wednesday, July 24, 2024