You are here

Home » Highline School District - Pacific Middle School Replacement

Highline School District - Pacific Middle School Replacement

Invitation to Bid 
Highline School District - Pacific Middle School Replacement:  
MACC 2 Early Bid Packages: 
 
BP 07A – Roofing, Sheet Metal and Metal Roofing 
BP 08D – Aluminum, Glass and Glazing   
 
Sealed bids will be received by Skanska U.S.A. Building, Inc. for construction subcontracts to the GC/CM Contract between Skanska U.S.A. Building, Inc. and Highline School District for the above listed Scopes of Work. Deliver sealed bids to: 
 
Highline Public Schools – Capital Planning and Construction Building A  17810 8th Avenue South 
Burien, WA 98148 
Attention:  David Carver – Senior Project Manager / Skanska USA Building 
 
Bid Dates and Times are as stated below: 
  
BID PACKAGES DUE DATES      
BP 07A – Roofing, Sheet Metal and Metal Roofing – Due no later than 11:00 AM on 4/28/25  
BP 08D – Aluminum, Glass and Glazing – Due no later than 11:00 AM on 4/28/25   
 
Bids will then be publicly opened and read aloud five minutes after the bid due time. Bids received after the dates and times stated above WILL NOT receive consideration. 
 
PRE-BID CONFERENCES  
A non-mandatory, though highly encouraged pre-bid conference will be held on site (Address Below) for MACC 2 Early Bid Packages. Pre-Bid Meeting will start at 2:00pm on April 07th, 2025 inside the existing commons. A job walk will take place directly following the pre-bid conference. 
 
Pacific Middle School 
22705 24th Ave S 
Des Moines, WA 98198 
  
Contract Documents for this work may be obtained online through Building Connected available Monday, March 31st, 2025; the documents will also be posted online at Builder’s Exchange of Washington (www.bxwa.com) under Posted Projects/General Contractor Project areas/Washington/Skanska/Projects Bidding.   
 
Questions that develop during the bid period must be submitted in writing and/or emailed to Skanska USA Building, Inc. to david.carver@skanska.com All questions and answers will be published via addenda during the bid period. Questions must be received no later than 12:00 PM on April 18th, 2025.  DO NOT present questions directly to the Architect/Engineer or the School District.   
 
BUSINESS EQUITY: The project is committed to providing an opportunity for participation in contracting local, small, and diverse business entities. Highline Public Schools has set a project goal of 10% minority business enterprises (MBEs), 6% women business enterprises (WBEs), and 5% public works small business enterprises 
(PWSBE), all state certified with the Office of Minority and Women Business Enterprises (OMWBE) Participation may be either on a direct contract basis or as a sub-tier trade partner or supplier. This project also has Federal Funding associated which includes goals to maximize DBE business participation. 

Closing Date: 
Monday, April 28, 2025
Organization: 
Skanska USA Building
Point of Contact: 
david.carver@skanska.com