You are here

Home » SCWSD Homestead Hills AC Main Replacement Project (01-2023W)

SCWSD Homestead Hills AC Main Replacement Project (01-2023W)

Principal items of Work included in HOMESTEAD HILLS AC PIPE REPLACEMENT, CONTRACT 01-2023W, are the replacement of approximately 6,070 lineal feet of existing 6-inch and 8-inch asbestos cement (AC) water main with 4-inch and 8-inch ductile iron (DI) water main; 4-inch PVC drain pipe, replacement of fire hydrants, valves, blow offs, meter boxes, water service lines from the new water main to the meter; water service lines from the existing water main to the meter, installation of a zone valve and vault; asphalt concrete patch and overlay; cement concrete driveway repair, and surface restoration. The existing water mains will be abandoned in place after being filled with controlled density fill (CDF) and the existing roadway will have a full width grind and overlay performed where new DI main has been installed.

Closing Date: 
Tuesday, April 22, 2025
Organization: 
Soos Creek Water & Sewer District
Point of Contact: 
chris.schmidt@bhcconsultants.com