Home » SR 529 / West Marine View Drive Bulkhead

SR 529 / West Marine View Drive Bulkhead

PROJECT NAME:               SR 529 / West Marine View Drive Bulkhead

PROJECT NO.:                    MR-CM-2023-02

ESTIMATED COST:            $4,000,000 - $4,500,000 (Incl. WSST)

BIDS DUE:                          May 6, 2025, at 10:00 am

PRE-BID MEETING:          April 17, 2025 at 11:00 am

located at the PORT of Everett office, 1205 Craftsman Way, Suite 200, Everett, WA 98201 and online via Zoom.

 

Public notice is hereby given that the PORT of Everett has issued a Request for Bids for the above-named project, with sealed bids due no later than the date and time given above. 

 

The overall project consists of the reconstruction of the existing Segment E bulkhead and wharf.  The existing 165 LF creosote timber bulkhead will be replaced with a new 165 LF of vertical steel sheet pile bulkhead wall along the entire water frontage.  The sheet piles will be installed waterward of the existing bulkhead to avoid causing instability of the ground upland of the bulkhead if it were to be removed.  The area behind the new bulkhead will be backfilled with gravel borrow fill material to encapsulate the existing bulkhead in place.  In addition, in order to connect the new bulkhead to an existing bulkhead on the south end of the project, a steel sheet pile cut-off wall will be installed.  Soils behind the proposed bulkhead wall will be improved with the addition of 24-inch diameter rigid ground inclusions.  Because the face of the replacement bulkhead is moving approximately 10 feet waterward, an existing outfall pipe needs to be extended through the new bulkhead.

 

The existing timber wharf (piles and deck) will be removed in its entirety.  This includes demolition of wharf and fender timber piles (creosote-treated timber piles and steel pipe piles).  The existing wharf will be replaced with a new wharf consisting of steel pipe piles supporting steel pile caps, timber stringers, and a timber deck.  There will also be steel fender piles installed to protect the wharf’s edge.  New overwater coverage is needed to fix a pinch point in the current pedestrian and commercial fishermen’s access configuration.

 

Additional work includes performing soil stabilizing rigid inclusion, building two new landscape beds with planting and irrigation, site lighting, hardscape restoration, and site furnishings.

 

WSDOT has assigned a Disadvantaged Business Enterprise (DBE) goal of 12% which applies to the final contract amount.  To be eligible to receive DBE credit for work on this project, the Contractor must verify the firm’s certification status in the OMWBE’s Directory of Certified Firms.  In addition, the Contractor shall provide on-the-job training aimed at developing trainees to journey-level status in the trades involved.  The number of training hours shall be 400 labor hours.

 

Complete details of the specification, plans, and all submittal requirements are available on-line at https://portofeverett.bonfirehub.com.  Note: Bids are encouraged to be submitted using the Bonfire platform, however the Port will still accept sealed paper bids may be submitted as outlined in the Contract Provisions.

 

 

Published:           April 8th, 2025 in Everett Herald and Seattle Daily Journal of Commerce

Closing Date: 
Tuesday, May 6, 2025
Organization: 
Port of Everett
Point of Contact: 
ashleyb@portofeverett.com