FREYA STREET WATER DISTRIBUTION MAIN FROM 21ST AVE TO 13TH AVE – DBE SUB QUOTES NEEDED
Big Sky ID Corp is soliciting qualified and certified UDBE/MBE/WBE subcontractor and material bids for the above referenced project. The project is located in Spokane, WA.
This project consists of the construction of approximately 3,000 cubic yards of excavation and embankment, 3,100 linear feet of 12-inch water main, 660 linear feet of 6-inch water main, 100 square yards of sidewalk, 6,600 square yards of 6-inch thick HMA pavement, 1,100 square yards of 4-inch thick HMA pavement, sundry utility adjustments, and other related miscellaneous items.
The plans are available at most local plan centers. If you are having difficulty locating the plans/specs, you may use this link below to download them from us, however, it will be your responsibility to verify any addenda. If you have any issues with the link, please reach out to Big Sky to be sent a link.
PLEASE NOTE ON YOUR QUOTE FORM IF YOU ARE AN MBE/WBE IN AND INCLUDE YOUR NUMBER.
Bids are due via email to Big Sky by 9:00 am on May 19, 2025. Project bid opening is May 19, 2025 at 1:00 pm.
All bids should be submitted to info@bigskyidaho.com.