You are here

Home » Renton High School Replacement Project - BP 32A Hydroseeding (RE-BID)

Renton High School Replacement Project - BP 32A Hydroseeding (RE-BID)

Invitation to BidRenton High School Replacement ProjectBid Package 32A Hydroseeding

Sealed bids will be received by Renton School District and Skanska U.S.A. Building, Inc. for construction subcontracts to the GC/CM Contract between Skanska U.S.A. Building, Inc. and Renton School District for the above listed Scope of Work.

  • Deliver sealed bids to:

Renton High School

400 S 2nd Street

Renton, WA 98057

Att: Peggy Wang – Senior Project Manager / Skanska USA Building

  • Bid Dates and Times are as stated below:

 

BP 32A Hydroseeding – 11:00 AM on Tuesday, July 1st, 2025

 

Bids will then be publicly opened and read aloud five minutes after the bid due time. Bids received after the dates and times stated above WILL NOT receive consideration.

 

Contract Documents for this work may be obtained online through Building Connected as well as Builder’s Exchange of Washington (www.bxwa.com) under Posted Projects/General Contractor Project areas/Washington/Skanska/Projects Bidding. They will be available on Tuesday, June 17th, 2025.

 

Questions that develop during the bid period must be submitted in writing and or emailed to Skanska USA Building, Inc. to peggy.wang@skanska.com All questions and answers will be published via addenda during the bid period. Questions must be received no later than 4:00 PM on June 23rd, 2025. DO NOT present questions directly to the Architect/Engineer or the School District.

 

BUSINESS EQUITY: The project is committed to providing the maximum practicable opportunity for participation in contracting by small business entities and disadvantaged business enterprises. That commitment includes maximizing opportunity for state-certified minority business enterprises (MBEs) and women business enterprises (WBEs) on public works construction projects (collectively referred to as MWBEs). Participation may be either on a direct basis or as a subcontractor or supplier.

 

RETENTION: will be held to the standard 5% retention.

 

Skanska USA Building, Inc. reserves the right to reject any or all bids and to waive any non-material abnormalities or irregularities in the bids received. A bidder may withdraw its proposal by submitting a written request before the bid opening time. Skanska will return the proposal unopened after the contract award.

Closing Date: 
Tuesday, July 1, 2025
Organization: 
Skanska USA INC
Point of Contact: 
peggy.wang@skanska.com