You are here

Home » Renton Transit Center and Roadway Improvements

Renton Transit Center and Roadway Improvements

 

Shimmick Construction Company, Inc.

An Equal Opportunity Employer

 

SBE and DBE Subcontractor/Supplier Bids Requested For:

 

Sound Transit

Renton Transit Center and Roadway ImprovementsIFB No. RTA/CN 0205-24REVISED BID DATE: Friday, July 18th, 2025 at 2:00pm

DBE Goal: 6%

Engineer’s Estimate: $63,482,553 - $73,004,936

 

Project Location: Renton, WA

 

Email quotes to jmiranda@shimmick.com

 

Shimmick Construction Company, Inc. is requesting quotes from certified DBE subcontractors and suppliers in the following scopes of work, including, but not limited to:

 

Erosion Control; Asphalt Paving; Electrical; HVAC; Mechanical; Concrete Flatwork; Misc. Metals; Rebar; Pavement Markings & Signage; Clear & Grub/Demo; Dewatering; Traffic Control; Fencing; Survey & Layout; Geotechnical Testing and Observation; Landscape & Irrigation; Telecom/Communications; Trucking (import/export/aggregate); Street Sweeping; Structural Concrete; Asphalt Milling

 

Plans and specifications are available via Biddingo: https://www.biddingo.com/soundtransit as well as DropBox: https://www.dropbox.com/scl/fo/c48p68lwhhpgsvyxf7puk/AHWtbISx6gn3MmEO2vobJow?rlkey=cw9vj4yrn0yr1tdfaam6yucno&st=4vds5ate&dl=0

You may contact Jamie Miranda at jmiranda@shimmick.com to set up a meeting via Teams to discuss the plans with an estimator. Meetings are held during regular business hours of 8am to 5pm.

 

Should you require assistance with your bid, please contact our lead estimator Joe Shinagle at joe.shinagle@shimmick.com.

 

All items of work listed above are made available, even items of work normally performed by Shimmick. Please contact the lead estimator listed above for assistance with breaking down items of work into economically feasible units, with assistance obtaining equipment, supplies, materials, bonding, insurance, estimating, or related assistance. 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project.  Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions.  Shimmick Construction’s listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Shimmick Construction requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. For assistance with bonding, insurance or lines of credit contact Todd Yoder at todd.yoder@shimmick.com.

 

This contract is subject to the requirements of the 49 U.S.C. 5323(j) (1), and the applicable regulations in 49 CFR Part 661; and requirements of 41 USC Ch 83 Build America, Buy America Act (BABA) and the applicable regulations regarding Construction Materials in 2 CFR Part 184.

 

Shimmick Construction Company, Inc.

1 Harbor Center, Suite 200

Suisun City, CA 94585

Phone (707) 410-5070

 

Closing Date: 
Friday, July 18, 2025
Organization: 
Shimmick Construction Company, Inc.
Point of Contact: 
jmiranda@shimmick.com