You are here

Home » Nisqually State Park – Welcome Center and Loop Trail, Phase 3B

Nisqually State Park – Welcome Center and Loop Trail, Phase 3B

Project Name

Nisqually State Park – Welcome Center and Loop Trail, Phase 3B

Location:

The project is located at the crossroads of SR7 and Mashel Prairie Road E,

approximately 0.1 mile south along Mashel Prairie RD E.

Owner/Agency:

STATE OF WASHINGTON - PARKS AND RECREATION COMMISSION

Point of contact:

BRIAN YEAROUT

CONSTRUCTION PROJECT ADMINISTRATOR

TELEPHONE: (360) 725-9763

Architect:

Robert W. Droll, Landscape Architect, PS

Estimate:

4.7-5.3 Million

Bids:

8/28 @ 1pm

Project Description:

This project includes a Welcome Center building and utilities and one way loop road that services it. It also includes a new multi-use trail, with a raised overlook.

This project does have a OMWBE goal:

10% MBE

6% WBE

5% Washington Small Business

5% Veterans

Additional Information:

  • Prevailing wage rates and Mandatory 15% apprentice requirements apply to this project.
  • Lincoln Construction encourages bids from ALL subcontractors and suppliers including SBE, NBE, MBE, DBE, VBE, DVBE, and WBE businesses.

Documents:  

Complete plans, specs & addenda for this project are available on-line at Bonfire.

​If you are unable to download the documents from the website above, please reach out (bids@lincolnnw.com) and we can send you a link.

Email to:

PLEASE EMAIL TO OUR DEDICATED BIDS EMAIL: bids@lincolnnw.com (253) 847-6414

Closing Date: 
Thursday, August 28, 2025
Organization: 
Lincoln Construction
Point of Contact: 
bids@lincolnnw.com