You are here

Home » Wastewater Lift Station Equipment Upgrades Phase 2

Wastewater Lift Station Equipment Upgrades Phase 2

Replacement of equipment at four (4) existing wastewater lift stations, referred to as Wastewater Lift Stations 17, 51, 52, and 53. This includes but is not limited to: Removal and replacement of pumping equipment, piping, valves, and appurtenances within existing dry wells/lift stations; installation and operation of temporary bypass pumping; removal of existing seal water systems; removal and replacement of the WWLS 51 above ground fuel storage tank; and modifications to the electrical and control systems related to the equipment replacement. Engineer’s Estimate for this work is $3,000,000 to $3,500,000. Plans, Contract Provisions, addenda, pertinent supplementary information, and plan holders list for this project are available on-line through Builders Exchange of Washington at http://www.bxwa.com. Click on: “Posted Projects”; “Public Works”, “City of Redmond”. Bidders are encouraged to “Register as a Bidder”, in order to receive automatic email notification of future addenda and to be placed on the “Bidders List”. Bidders that do not register will not be notified of addenda or other documents added. Contact Builders Exchange of Washington at (425) 258-1303 should you require further assistance.

Closing Date: 
Thursday, October 2, 2025
Organization: 
City of Redmond
Point of Contact: 
Mike Haley, mhaley@redmond.gov