Ray Williamson Pool Improvements, Phase 2
Ray Williamson Pool Improvements, Phase 2
Bainbridge Island Metro Park & Recreation District
Bainbridge Island, WA
BID DATE: 3/10/2026 @ 2:00 PM
Project Description:
The Ray Williamson Pool Renovation Phase 2 project includes but is not limited to: replacement of concrete pool deck, linear trench drains, remove concrete platform, perimeter pool tile, pool deck equipment inserts, storefront system and swing out doors at natatorium, pool liner coating removal and replacement, remove and replace acoustical ceiling tile in natatorium, handrail at SW ramp, east concrete side walk and curb under storefront, pool filtration system, pool chemical treatment conversion to saline/chlorine system, repair/replacement of general domestic water piping and plumbing, refurbishing the existing glue lam metal bases, install new fence system, install new VGB drain system, , anti slip coating at steps and SW ramp in the Ray Williamson Pool at the Bainbridge Island Aquatics Center building.
Estimated Value:
$3,100,000 to $3,500,000
Owner:
Bainbridge Island Metro Park & Recreation District
8521 Madison Ave. N.
Bainbridge Island, WA 98110
Additional Information:
-
Prevailing wage rates and Mandatory 15% apprentice requirements apply to this project
-
Kassel & Associates, Inc. is an Equal Opportunity Employer. We encourage bids from ALL subcontractors and suppliers including Small, Emerging Small, Native, Alaska Native, Women, Minority, Disadvantaged, Veteran, Vietnam Veteran, Disabled Veteran, 8(a), and HUBZone businesses
-
Kassel & Associates, Inc. is signatory to the Carpenter's Union
Documents:
Complete plans, specs & addenda for this project are available on-line at Builders Exchange of Washington http://www.bxwa.com
We are an equal opportunity employer and request bids from all interested firms including disadvantaged, minority, and women business enterprises.
PLEASE FEEL FREE TO EMAIL THE PROJECT ESTIMATOR, MATT VERNON - Bids@kasselandassociates.com
WA: KASSEAI914OM

