Renton High School Replacement Project - MACC-02 Sitework
Invitation to BidRenton High School Replacement MACC 02 - Main Construction Bid Group 2
BP 31B – EARTHWORK & UTILITIESBP 31E –ASPHALT & STRIPINGBP 32D – SITE FLATWORK & IMPROVEMENTSBP 32E –LANDSCAPE & TURF
Sealed bids will be received by Renton School District and Skanska U.S.A. Building, Inc. for construction subcontracts to the GC/CM Contract between Skanska U.S.A. Building, Inc. and Renton School District for the above listed Scopes of Work.
Deliver sealed bids to:
Renton School District FOMC
7812 S 124th St,
Seattle, WA 98178
Attention: Josiah Mooi - Project Manager / Skanska USA Building
Bid Dates and Times are as stated below:
BID PACKAGES DUE DATES
BP 31B – EARTHWORK & UTILITIES - Due no later than 10:00AM on 8/12/2026
BP 31E – ASPHALT & STRIPING - Due no later than 10:15AM on 8/12/2026
BP 32D – SITE FLATWORK & IMPROVEMENTS - Due no later than 10:30AM on 8/12/2026
BP 32E – LANDSCAPE & TURF - Due no later than 10:45AM on 8/12/2026
Bids will then be publicly opened and read aloud five minutes after the bid due time. Bids received after the dates and times stated above WILL NOT receive consideration.
PRE-BID CONFERENCES
A non-mandatory, though highly encouraged pre-bid conference and site walk will be held for MACC 02 Main Construction Bid Group 2 Packages. Pre-Bid Meeting will begin at 10:00 am on 7/13/2026. The meeting will begin at the location described below.
Skanska Jobsite Office
710 S Second St.
Renton, WA 98057
Contract Documents for this work may be obtained online through Building Connected as well as Builder’s Exchange of Washington (www.bxwa.com) under Posted Projects/General Contractor Project areas/Washington/Skanska/Projects Bidding. They will be available Tuesday, July 7, 2026.
Questions that develop during the bid period must be submitted in writing and or emailed to Skanska USA Building, Inc. to Josiah.Mooi@skanska.com All questions and answers will be published via addenda during the bid period. Questions must be received no later than 1:00 PM on July 29, 2026. DO NOT present questions directly to the Architect/Engineer or the School District.
BUSINESS EQUITY: The project is committed to providing the maximum practicable opportunity for participation in contracting by small business entities and disadvantaged business enterprises. That commitment includes maximizing opportunity for state-certified minority business enterprises (MBEs) and women business enterprises (WBEs) on public works construction projects (collectively referred to as MWBEs). Participation may be either on a direct basis or as a subcontractor or supplier.
RETENTION: Skanska plans to obtain a Retention Bond for the project. Subcontractors will have the option of participating in the Skanska a retention bond in lieu of having retention held. Those who do not participate will be held to the standard 5% retention.
Skanska USA Building, Inc. reserves the right to reject any or all bids and to waive any non-material informalities or irregularities in the bids received. A bidder may withdraw its proposal by submitting a written request before the bid opening time. Skanska will return the proposal unopened after contract award.