CFB-Lift Station and Force Main Rehab Ph 2 (Group 1B)
The work to be performed within 160 working days from the date of commencement under this contract shall include, but not be limited to:
- Lift stations included in Phase 2 (Group 1B) are as follows:
- Baxter Lift Station
- Devil’s Elbow Lift Station
- East Valley Lift Station
- Mechanical Improvements:
- Installation of pigging port access assemblies
- Vactor piping installation inside wet wells
- Pump impeller replacement
- Structural Improvements:
- Removal of existing wet well coating
- Electrical Improvements:
- Rerouting secondary conductors, emergency engine generator installation and its ancillary equipment
- Modifying and replacing existing control panels
- Force Main Improvements:
- Installation of magnetic markers along force main alignment
- Site Improvements at Devil’s Elbow Lift Station:
- Slope Stabilization
- Storm Drainage Improvements
- Construction will also require temporary pumping during the lift station shutdown for mechanical improvements, landscape restoration asphalt restoration, and concrete restoration.
The estimated project cost is $750,000 to $1,000,000