I-90, Cabin Creek I/C to W Easton I/C Phase 3 - Add Lanes/Wildlife Bridges
Project Description: Replacing the existing four lane facility (two lanes in each direction) with a six-lane facility (three lanes in each direction, with truck climbing lanes in select locations). Install new culverts, new bridges, wildlife undercrossing and overcrossing, constructing hydraulic connectivity zones (HCZ) at five locations, wildlife exclusion fencing, structural walls, concrete paving, hot mix asphalt (HMA) paving, installing concrete barrier, guardrail, illumination, intelligent transportation system (ITS), traffic control and other work.
Subcontract/Supplier Opportunities Include (But Not Limited to): Survey, Structure and Roadway Excavation, Trucking, Concrete Paving, Asphalt Paving, Drilled Shafts, Soldier Pile Walls, Bridge Construction, Rebar, Erosion Control, Clearing and Grubbing, Habitat Restoration, Culvert Construction, MSE Retaining Walls, Earthwork, Rock Blasting, Fencing, Pavement Marking, Traffic Control, Structure Demolition, Concrete Barrier, Guardrail, Traffic Barrier, Sign Installation, Sign Structures, Gravel Backfill & Compaction, Permanent Ground Anchors, Electrical (incl illumination and ITS systems) and Drainage.
Walsh Construction Company II, LLC encourages bids from all subcontractors and suppliers including Disadvantaged Business Enterprises (DBE) or Minority/Women Business Enterprises (M/WBE) or Minority, Small, Veteran, Disabled Veteran & Women Enterprises (MSVWBE) for any item of work, portion of an item, or combination thereof. If you require information regarding assistance in obtaining bonding, insurance, credit, equipment, supplies, materials or related service please call our office at (206) 394-7300.
Plans & Specifications can be viewed at:
https://ftp.wsdot.wa.gov/contracts/9786-CabinCreekiCtoWEastonICPhase3Add...