Terminal Park Elementary School Replacement (Synthetic Turf Fields - Bid Package 02755)
Ohno Construction invites your firm to submit a bid for the following project:
Terminal Park Elementary School Replacement (Synthetic Turf Fields - Bid Package 02755)
Auburn School District and Skanska
PROJECT DESCRIPTION:
For the Synthetic Turf Fields (Bid Package 02755), the scope of work includes, but is not limited to, Infilled Synthetic Turf, Field Subsurface Drainage, and Permeable Aggregates. Related work includes Storm Utility Drainage Piping and Subdrainage.
BID DUE DATE & TIME: February 15th 2022, @ end of day
Proposals may be emailed to estimating@ohnoconstruction.com or faxed to 206-324-8063. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.
- RFI due to Skanska by 12:00 PM on February 7th, 2022
- SBE – 10% goal
- MBE – 7% goal
- The Synthetic Turf Field work is scheduled to start on 5/9/23 and end 6/27/23.
- Liquidated Damages - $1000/calendar day for first 17 days, then $1500 after 17 days (page 3 of 4 of Bid Form or page 13 of 125 of Bid Package 02755 – Synthetic Turf Field)
- See attached Baseline Schedule - Synthetic Turf Field - Terminal Park Elementary for timings
- The Project is subject to Prevailing Wages
- See Exhibit “A.3” for COVID REQUIRMENTS.
BID DOCUMENTS:
https://ohno.sharefile.com/home/shared/fo27bd21-3eed-4caf-9b55-ddb419ed7ee1
Login Email: ohnocc.wa@gmail.com
Login Password: Yosh1966!
*Any subcontractors who are interested in submitting a quote for this project please be advised to review any proof of Covid Vaccination requirements for on-site workers before turning in a bid. All specifications (including those relating to Covid) apply to all subcontractors and suppliers. See Exhibit “A.3” for COVID REQUIRMENTS.
Bid documents are provided for your reference only. Ohno makes its best attempt to provide subcontractors with the most complete and current project information for bidding purposes. However, Ohno is not responsible for the accuracy of the supplied bid documents. All takeoff quantities provided by Ohno are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote. Please contact the Estimating Department for any questions.
STANDARD REQUIREMENTS:
By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. Any and all bids may be rejected at the sole discretion of Ohno Construction. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2 percent. The surety must be a Washington admitted surety. Insurance must name Ohno, the project Owner and any other parties so designated as additionally insured and be in the types and amounts required by the specifications. Please contact our office if you need assistance.
BID RESPONSE:
Please return your Bid Response to the Estimating Department by email at estimating@ohnoconstruction.com or by fax to 206-324-8063. Ohno Construction Company is an equal opportunity employer and encourages minority, women, veteran, small, and disadvantaged businesses to submit proposals.
Our firm will be providing a bid for this project: YES NO IF NO, WHY:
CONTACT: PHONE:
COMPANY: WA LICENSE #:
SCOPE COVERED: EMAIL/FAX: