Holly Street Campus – Creek Bank Repair
Notice is hereby given that sealed bids will be received by Issaquah School District No. 411, 5150 220th AVE
SE, Issaquah, Washington 98029, for the construction of Holly Street Campus – Creek Bank Repair.
The Issaquah School District is soliciting bids to remove existing temporary stream bank structure and
construct a permanent bio-engineered structure for stream bank stabilization. This work will occur during
the 2022 WDWF fish window in Issaquah Creek. The project is located at 565 NW Holly Street, Issaquah,
WA 98027. The Base Bid and alternates will be used to determine apparent low bidder and the Contract
Sum, as that term is defined and used in the Contract Documents.
See Attachments